{"id":135,"date":"2019-12-03T17:34:37","date_gmt":"2019-12-03T17:34:37","guid":{"rendered":"https:\/\/tprince.net\/santin\/?page_id=135"},"modified":"2019-12-05T19:32:16","modified_gmt":"2019-12-05T19:32:16","slug":"energia","status":"publish","type":"page","link":"http:\/\/gruposantin.com.br\/english\/energia\/","title":{"rendered":"Energy"},"content":{"rendered":"<p>[et_pb_section bb_built=&#8221;1&#8243; next_background_color=&#8221;#ffffff&#8221; _builder_version=&#8221;3.6&#8243; background_image=&#8221;http:\/\/gruposantin.com.br\/english\/wp-content\/uploads\/2019\/12\/6865899-world-map-wallpaper1.jpg&#8221;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text _builder_version=&#8221;3.6&#8243; background_layout=&#8221;dark&#8221;]<\/p>\n<h1>Energy<\/h1>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][\/et_pb_section][et_pb_section bb_built=&#8221;1&#8243; fullwidth=&#8221;off&#8221; specialty=&#8221;off&#8221; prev_background_color=&#8221;#000000&#8243;][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text _builder_version=&#8221;3.6&#8243;]<\/p>\n<h3>Client: Biocon<\/h3>\n<ul>\n<li>Project: Biocon \/ Angola<\/li>\n<\/ul>\n<p>[\/et_pb_text][et_pb_toggle _builder_version=&#8221;3.6&#8243; title=&#8221;Work Details&#8221;]<\/p>\n<p><strong>Work Details<\/strong><br \/>\nImplementation of a 120 MW Biomass Thermoelectric Plant<\/p>\n<ul>\n<li>Assembly and Installation of 02 Boilers VS-500 &#8211; 200tvh, 67,0kgf \/ cm\u00b2, temp: 485\u00ba each.<\/li>\n<li>Assembly and Interconnection of Steam Pipes between Boiler and Power House:<\/li>\n<li>Alloy Steel Pipe 67kgf \/ cm\u00b2;<\/li>\n<li>Steam Lowering Pipe;<\/li>\n<li>Water Cooling Pipe for Generators and Condensers.<\/li>\n<li>Installation and Assembly of the Sugarcane Bagasse System.<\/li>\n<li>Cane Reception System Assembly:<\/li>\n<li>Feeding table;<\/li>\n<li>Conveyor belt;<\/li>\n<li>Diffuser;<\/li>\n<li>Milling Suit.<\/li>\n<li>Fermentation System Assembly and Interconnection:<\/li>\n<li>Fermentation vats;<\/li>\n<li>Pre-Fermentation;<\/li>\n<li>Pre-Fermentation Structure;<\/li>\n<li>Heat exchangers;<\/li>\n<li>Cooling towers.<\/li>\n<li>Assembly and Interconnection of the Alcohol Manufacturing System:<\/li>\n<li>Distillation columns;<\/li>\n<li>Condensers;<\/li>\n<li>Heat exchangers;<\/li>\n<li>Alcohol Measurement Tanks;<\/li>\n<li>Cooling towers.<\/li>\n<li>Assembly and Interconnection of Alcohol Storage System:<\/li>\n<li>10,000 m\u00b3 tanks.<\/li>\n<li>Pipe-Rack Mounting and Interconnection:<\/li>\n<li>Steam pipes;<\/li>\n<li>Broth pipes;<\/li>\n<li>Water pipes;<\/li>\n<li>Chemical pipes;<\/li>\n<li>Honey pipes;<\/li>\n<li>Condensate pipes.<\/li>\n<li>Fabrication and Assembly of Structures:<\/li>\n<li>Pipe racks;<\/li>\n<li>Powerhouse floor;<\/li>\n<li>Pre-Fermentation Floor;<\/li>\n<li>Fermentation floor;<\/li>\n<li>Broth Treatment Floor;<\/li>\n<li>Broth Heating Floor.<\/li>\n<\/ul>\n<p>[\/et_pb_toggle][et_pb_gallery _builder_version=&#8221;3.6&#8243; gallery_ids=&#8221;137,138,139,140&#8243; show_title_and_caption=&#8221;off&#8221; show_pagination=&#8221;off&#8221; zoom_icon_color=&#8221;#2ea3f2&#8243; hover_overlay_color=&#8221;rgba(255,255,255,0.9)&#8221; \/][\/et_pb_column][\/et_pb_row][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text _builder_version=&#8221;3.6&#8243;]<\/p>\n<h3>Client: ENERGISA<\/h3>\n<ul>\n<li>Project: Vista Alegre I e II \/ MS<\/li>\n<\/ul>\n<p>[\/et_pb_text][et_pb_toggle _builder_version=&#8221;3.6&#8243; title=&#8221;Work Details&#8221;]<\/p>\n<p><strong>Work Details<\/strong><br \/>\nImplementation of a 60 MW Biomass Thermoelectric Plant<\/p>\n<ul>\n<li>Earthworks;<\/li>\n<li>Equipment Base;<\/li>\n<li>Drainage;<\/li>\n<li>Paving;<\/li>\n<li>CCM;<\/li>\n<li>Powerhouse;<\/li>\n<li>Cooling tower;<\/li>\n<li>Energy Cogeneration System;<\/li>\n<li>Backpressure Turbogenerator &#8211; 30 MW;<\/li>\n<li>Condensation Turbogenerator &#8211; 30 MW;<\/li>\n<li>Pipe-Racks and Powerhouse Structures;<\/li>\n<li>High Pressure Steam System Interconnection &#8211; 67 kgf \/ cm\u00b2 between Boiler and Powerhouse;<\/li>\n<li>Interconnection of the cooling tower system;<\/li>\n<li>Steam Lowering System with conditioning valves;<\/li>\n<li>Condensed Water System Interconnection;<\/li>\n<li>Condensed Water Tank Fabrication and Assembly<\/li>\n<li>Powerhouse Floor Supply and Assembly;<\/li>\n<li>Supply and Assembly of Demineralized Water Tank &#8211; 4,000 m\u00b3.<\/li>\n<\/ul>\n<p>[\/et_pb_toggle][et_pb_gallery _builder_version=&#8221;3.6&#8243; gallery_ids=&#8221;141,142,143,144&#8243; show_title_and_caption=&#8221;off&#8221; show_pagination=&#8221;off&#8221; zoom_icon_color=&#8221;#2ea3f2&#8243; hover_overlay_color=&#8221;rgba(255,255,255,0.9)&#8221; \/][\/et_pb_column][\/et_pb_row][et_pb_row][et_pb_column type=&#8221;4_4&#8243;][et_pb_text _builder_version=&#8221;3.6&#8243;]<\/p>\n<h3>Client: BROOKFIELD<\/h3>\n<ul>\n<li>Project: Santa C\u00e2ndida I e II \/ SP<\/li>\n<\/ul>\n<p>[\/et_pb_text][et_pb_toggle _builder_version=&#8221;3.6&#8243; title=&#8221;Work Details&#8221;]<\/p>\n<p><strong>Implementation of a 60 MW Biomass Thermoelectric Plant<\/strong><\/p>\n<ul>\n<li>Earthworks;<\/li>\n<li>Equipment Base;<\/li>\n<li>Drainage;<\/li>\n<li>Paving;<\/li>\n<li>CCM;<\/li>\n<li>Powerhouse;<\/li>\n<li>Cooling tower;<\/li>\n<li>Energy Cogeneration System;<\/li>\n<li>Backpressure Turbogenerator &#8211; 30 MW;<\/li>\n<li>Condensation Turbogenerator &#8211; 30 MW;<\/li>\n<li>Pipe-Racks and Powerhouse Structures;<\/li>\n<li>High Pressure Steam System Interconnection &#8211; 67 kgf \/ cm\u00b2 between Boiler and Powerhouse;<\/li>\n<li>Interconnection of the cooling tower system;<\/li>\n<li>Steam Lowering System with conditioning valves;<\/li>\n<li>Condensed Water System Interconnection;<\/li>\n<li>Condensed Water Tank Fabrication and Assembly<\/li>\n<li>Powerhouse Floor Supply and Assembly;<\/li>\n<li>Supply and Assembly of Demineralized Water Tank &#8211; 4,000 m\u00b3.<\/li>\n<\/ul>\n<p>[\/et_pb_toggle][et_pb_gallery _builder_version=&#8221;3.6&#8243; gallery_ids=&#8221;145,146,147,148&#8243; show_title_and_caption=&#8221;off&#8221; show_pagination=&#8221;off&#8221; zoom_icon_color=&#8221;#2ea3f2&#8243; hover_overlay_color=&#8221;rgba(255,255,255,0.9)&#8221; \/][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p><div class=\"et_pb_row et_pb_row_0 et_pb_row_empty\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div> Energy <div class=\"et_pb_row et_pb_row_1 et_pb_row_empty\">\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t\t\n\t\t\t<\/div> Client: Biocon Project: Biocon \/ Angola Work Details Implementation of a 120 MW Biomass Thermoelectric Plant Assembly and Installation of 02 Boilers VS-500 &#8211; 200tvh, 67,0kgf \/ cm\u00b2, temp: 485\u00ba each. Assembly and Interconnection of Steam Pipes between Boiler and Power House: Alloy Steel Pipe 67kgf \/ cm\u00b2; Steam Lowering Pipe; Water [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"class_list":["post-135","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/gruposantin.com.br\/english\/wp-json\/wp\/v2\/pages\/135","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/gruposantin.com.br\/english\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/gruposantin.com.br\/english\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/gruposantin.com.br\/english\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/gruposantin.com.br\/english\/wp-json\/wp\/v2\/comments?post=135"}],"version-history":[{"count":3,"href":"http:\/\/gruposantin.com.br\/english\/wp-json\/wp\/v2\/pages\/135\/revisions"}],"predecessor-version":[{"id":253,"href":"http:\/\/gruposantin.com.br\/english\/wp-json\/wp\/v2\/pages\/135\/revisions\/253"}],"wp:attachment":[{"href":"http:\/\/gruposantin.com.br\/english\/wp-json\/wp\/v2\/media?parent=135"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}