Energy
Client: Biocon
- Project: Biocon / Angola
Work Details
Work Details
Implementation of a 120 MW Biomass Thermoelectric Plant
- Assembly and Installation of 02 Boilers VS-500 – 200tvh, 67,0kgf / cm², temp: 485º each.
- Assembly and Interconnection of Steam Pipes between Boiler and Power House:
- Alloy Steel Pipe 67kgf / cm²;
- Steam Lowering Pipe;
- Water Cooling Pipe for Generators and Condensers.
- Installation and Assembly of the Sugarcane Bagasse System.
- Cane Reception System Assembly:
- Feeding table;
- Conveyor belt;
- Diffuser;
- Milling Suit.
- Fermentation System Assembly and Interconnection:
- Fermentation vats;
- Pre-Fermentation;
- Pre-Fermentation Structure;
- Heat exchangers;
- Cooling towers.
- Assembly and Interconnection of the Alcohol Manufacturing System:
- Distillation columns;
- Condensers;
- Heat exchangers;
- Alcohol Measurement Tanks;
- Cooling towers.
- Assembly and Interconnection of Alcohol Storage System:
- 10,000 m³ tanks.
- Pipe-Rack Mounting and Interconnection:
- Steam pipes;
- Broth pipes;
- Water pipes;
- Chemical pipes;
- Honey pipes;
- Condensate pipes.
- Fabrication and Assembly of Structures:
- Pipe racks;
- Powerhouse floor;
- Pre-Fermentation Floor;
- Fermentation floor;
- Broth Treatment Floor;
- Broth Heating Floor.
Client: ENERGISA
- Project: Vista Alegre I e II / MS
Work Details
Work Details
Implementation of a 60 MW Biomass Thermoelectric Plant
- Earthworks;
- Equipment Base;
- Drainage;
- Paving;
- CCM;
- Powerhouse;
- Cooling tower;
- Energy Cogeneration System;
- Backpressure Turbogenerator – 30 MW;
- Condensation Turbogenerator – 30 MW;
- Pipe-Racks and Powerhouse Structures;
- High Pressure Steam System Interconnection – 67 kgf / cm² between Boiler and Powerhouse;
- Interconnection of the cooling tower system;
- Steam Lowering System with conditioning valves;
- Condensed Water System Interconnection;
- Condensed Water Tank Fabrication and Assembly
- Powerhouse Floor Supply and Assembly;
- Supply and Assembly of Demineralized Water Tank – 4,000 m³.
Client: BROOKFIELD
- Project: Santa Cândida I e II / SP
Work Details
Implementation of a 60 MW Biomass Thermoelectric Plant
- Earthworks;
- Equipment Base;
- Drainage;
- Paving;
- CCM;
- Powerhouse;
- Cooling tower;
- Energy Cogeneration System;
- Backpressure Turbogenerator – 30 MW;
- Condensation Turbogenerator – 30 MW;
- Pipe-Racks and Powerhouse Structures;
- High Pressure Steam System Interconnection – 67 kgf / cm² between Boiler and Powerhouse;
- Interconnection of the cooling tower system;
- Steam Lowering System with conditioning valves;
- Condensed Water System Interconnection;
- Condensed Water Tank Fabrication and Assembly
- Powerhouse Floor Supply and Assembly;
- Supply and Assembly of Demineralized Water Tank – 4,000 m³.