Energy

Client: Biocon

  • Project: Biocon / Angola
Work Details

Work Details
Implementation of a 120 MW Biomass Thermoelectric Plant

  • Assembly and Installation of 02 Boilers VS-500 – 200tvh, 67,0kgf / cm², temp: 485º each.
  • Assembly and Interconnection of Steam Pipes between Boiler and Power House:
  • Alloy Steel Pipe 67kgf / cm²;
  • Steam Lowering Pipe;
  • Water Cooling Pipe for Generators and Condensers.
  • Installation and Assembly of the Sugarcane Bagasse System.
  • Cane Reception System Assembly:
  • Feeding table;
  • Conveyor belt;
  • Diffuser;
  • Milling Suit.
  • Fermentation System Assembly and Interconnection:
  • Fermentation vats;
  • Pre-Fermentation;
  • Pre-Fermentation Structure;
  • Heat exchangers;
  • Cooling towers.
  • Assembly and Interconnection of the Alcohol Manufacturing System:
  • Distillation columns;
  • Condensers;
  • Heat exchangers;
  • Alcohol Measurement Tanks;
  • Cooling towers.
  • Assembly and Interconnection of Alcohol Storage System:
  • 10,000 m³ tanks.
  • Pipe-Rack Mounting and Interconnection:
  • Steam pipes;
  • Broth pipes;
  • Water pipes;
  • Chemical pipes;
  • Honey pipes;
  • Condensate pipes.
  • Fabrication and Assembly of Structures:
  • Pipe racks;
  • Powerhouse floor;
  • Pre-Fermentation Floor;
  • Fermentation floor;
  • Broth Treatment Floor;
  • Broth Heating Floor.

Client: ENERGISA

  • Project: Vista Alegre I e II / MS
Work Details

Work Details
Implementation of a 60 MW Biomass Thermoelectric Plant

  • Earthworks;
  • Equipment Base;
  • Drainage;
  • Paving;
  • CCM;
  • Powerhouse;
  • Cooling tower;
  • Energy Cogeneration System;
  • Backpressure Turbogenerator – 30 MW;
  • Condensation Turbogenerator – 30 MW;
  • Pipe-Racks and Powerhouse Structures;
  • High Pressure Steam System Interconnection – 67 kgf / cm² between Boiler and Powerhouse;
  • Interconnection of the cooling tower system;
  • Steam Lowering System with conditioning valves;
  • Condensed Water System Interconnection;
  • Condensed Water Tank Fabrication and Assembly
  • Powerhouse Floor Supply and Assembly;
  • Supply and Assembly of Demineralized Water Tank – 4,000 m³.

Client: BROOKFIELD

  • Project: Santa Cândida I e II / SP
Work Details

Implementation of a 60 MW Biomass Thermoelectric Plant

  • Earthworks;
  • Equipment Base;
  • Drainage;
  • Paving;
  • CCM;
  • Powerhouse;
  • Cooling tower;
  • Energy Cogeneration System;
  • Backpressure Turbogenerator – 30 MW;
  • Condensation Turbogenerator – 30 MW;
  • Pipe-Racks and Powerhouse Structures;
  • High Pressure Steam System Interconnection – 67 kgf / cm² between Boiler and Powerhouse;
  • Interconnection of the cooling tower system;
  • Steam Lowering System with conditioning valves;
  • Condensed Water System Interconnection;
  • Condensed Water Tank Fabrication and Assembly
  • Powerhouse Floor Supply and Assembly;
  • Supply and Assembly of Demineralized Water Tank – 4,000 m³.