Sugar and alcohol
Client: ODEBRECHT AGROINDUSTRIAL
- Project: Água Emendada / GO
Work Details
Work Details
Implementation of a 120 MW Biomass Thermoelectric Plant
- Assembly and Installation of the Fermentation System, being 8 Dornas of 2,000 m³ each;
- Assembly and Installation of Yeast Centrifugation System;
- Assembly and Installation of Pre-Fermenters, being 3 units of 200 m³ each;
- Assembly and Installation of Broth Evaporation System with Integrated Multi-Way Steam System and Large Diameter Pipes – up to 60 ”;
- Broth Decanters Assembly and Installation – 02 units chap. 600 m³ each;
- Assembly and Installation of Particle Separator Filter System;
- Assembly and Installation of Vacuum Filtration System;
- Cooling Tower System Interconnections; High Pressure Steam System Interconnection – 67.0 kgf / cm² interconnecting in 30 MW power turbines, two turbines;
- Interconnection of the steam lowering system with the aid of conditioning valves, from 67.0 kgf / cm² to 21 kgf / cm² and 1.5 kgf / cm²;
- Manufacture and Assembly of Ethanol Tanks cap 10,000 m³ and 20,000 m³ with integrated fire system;
- Mounting and Installation of Diffuser in stainless steel cap. 15,000 tons / day;
- Cane Feed System Assembly (Feeding Table and Conveyor Belt);
- Assembly and Installation of the Alcohol Distilling Apparatus System – chap. Of 1,000 m³ each.
Client: ODEBRECHT AGROINDUSTRIAL
- Project: Usina Santa Luzia
Work Details
Work Details
Alcohol Storage System:
- 02 Tanks cap. 20,000 m³ each;
- Interconnection of the Fire and Alcohol System.
- Cooling Tower System Interconnections;
- High Pressure Steam System Interconnection – 67.0 kgf / cm² interconnecting in 30 MW power turbines, two turbines;
- Interconnection of the steam lowering system with the aid of conditioning valves, from 67.0 kgf / cm² to 21 kgf / cm² and 1.5 kgf / cm²;
- Installation and Assembly of the Sugarcane Bagasse System;
- Cane and Dry Cleaning System Installation and Assembly;
- Manufacture and Assembly of 01 2,000 m³ Fermentation Dorn with interconnection in the existing system;
- Fire Protection and Fire Fighting System throughout the industrial area.
- Abrir no Google Tradutor
Client: ODEBRECHT AGROINDUSTRIAL
- Project: Usina Eldorado
Work Details
Work Details
Assembly and Installation of Power Cogeneration System:
- Backpressure Turbogenerator – 55 MW;
- Condensation Turbogenerator – 55 MW;
- Supply and Assembly of Pipe-Racks and Powerhouse Structures;
- Interconnection of High Pressure Steam System 100 kgf / cm² between Boiler and Power House;
- Interconnection of the cooling tower system;
- Steam Lowering System Interconnection;
- Powerhouse Floor Supply and Mounting.
- Fermentation and Distillation System Manufacturing, Assembly and Installation:
- 8 drums of 2,000 m³ each;
- Assembly and Installation of Yeast Centrifugation System;
- Assembly and Installation of Pre-Fermenters, being 3 units of 200 m³ each;
- Cooling Tower System Interconnections;
- Assembly and Installation of the Alcohol Distilling Apparatus System – chap. 1,500 m³ each;
- Fire Protection and Fire Fighting System throughout the industrial area and Alcohol Storage.
- Assembly and Installation of Broth Evaporation and Decantation System:
- Assembly and Installation of Broth Evaporation System with Integrated Multi-Way Steam System and Large Diameter Pipes – up to 70 ”;
- Broth Decanter Manufacturing, Assembly and Installation – 01 unit cap. 600 m³;
- Assembly and Installation of Particle Separator Filter System;
- Assembly and Installation of Vacuum Filtration System.
- Alcohol Storage System:
- 02 Tanks cap. 20,000 m³ each;
- Interconnection of the Fire and Alcohol System.