Sugar and alcohol

Client: ODEBRECHT AGROINDUSTRIAL

  • Project: Água Emendada / GO
Work Details

Work Details

Implementation of a 120 MW Biomass Thermoelectric Plant

  • Assembly and Installation of the Fermentation System, being 8 Dornas of 2,000 m³ each;
  • Assembly and Installation of Yeast Centrifugation System;
  • Assembly and Installation of Pre-Fermenters, being 3 units of 200 m³ each;
  • Assembly and Installation of Broth Evaporation System with Integrated Multi-Way Steam System and Large Diameter Pipes – up to 60 ”;
  • Broth Decanters Assembly and Installation – 02 units chap. 600 m³ each;
  • Assembly and Installation of Particle Separator Filter System;
  • Assembly and Installation of Vacuum Filtration System;
  • Cooling Tower System Interconnections; High Pressure Steam System Interconnection – 67.0 kgf / cm² interconnecting in 30 MW power turbines, two turbines;
  • Interconnection of the steam lowering system with the aid of conditioning valves, from 67.0 kgf / cm² to 21 kgf / cm² and 1.5 kgf / cm²;
  • Manufacture and Assembly of Ethanol Tanks cap 10,000 m³ and 20,000 m³ with integrated fire system;
  • Mounting and Installation of Diffuser in stainless steel cap. 15,000 tons / day;
  • Cane Feed System Assembly (Feeding Table and Conveyor Belt);
  • Assembly and Installation of the Alcohol Distilling Apparatus System – chap. Of 1,000 m³ each.

Client: ODEBRECHT AGROINDUSTRIAL

  • Project: Usina Santa Luzia
Work Details

Work Details
Alcohol Storage System:

  • 02 Tanks cap. 20,000 m³ each;
  • Interconnection of the Fire and Alcohol System.
  • Cooling Tower System Interconnections;
  • High Pressure Steam System Interconnection – 67.0 kgf / cm² interconnecting in 30 MW power turbines, two turbines;
  • Interconnection of the steam lowering system with the aid of conditioning valves, from 67.0 kgf / cm² to 21 kgf / cm² and 1.5 kgf / cm²;
  • Installation and Assembly of the Sugarcane Bagasse System;
  • Cane and Dry Cleaning System Installation and Assembly;
  • Manufacture and Assembly of 01 2,000 m³ Fermentation Dorn with interconnection in the existing system;
  • Fire Protection and Fire Fighting System throughout the industrial area.
  • Abrir no Google Tradutor

Client: ODEBRECHT AGROINDUSTRIAL

  • Project: Usina Eldorado
Work Details

Work Details
Assembly and Installation of Power Cogeneration System:

  • Backpressure Turbogenerator – 55 MW;
  • Condensation Turbogenerator – 55 MW;
  • Supply and Assembly of Pipe-Racks and Powerhouse Structures;
  • Interconnection of High Pressure Steam System 100 kgf / cm² between Boiler and Power House;
  • Interconnection of the cooling tower system;
  • Steam Lowering System Interconnection;
  • Powerhouse Floor Supply and Mounting.
  • Fermentation and Distillation System Manufacturing, Assembly and Installation:
  • 8 drums of 2,000 m³ each;
  • Assembly and Installation of Yeast Centrifugation System;
  • Assembly and Installation of Pre-Fermenters, being 3 units of 200 m³ each;
  • Cooling Tower System Interconnections;
  • Assembly and Installation of the Alcohol Distilling Apparatus System – chap. 1,500 m³ each;
  • Fire Protection and Fire Fighting System throughout the industrial area and Alcohol Storage.
  • Assembly and Installation of Broth Evaporation and Decantation System:
  • Assembly and Installation of Broth Evaporation System with Integrated Multi-Way Steam System and Large Diameter Pipes – up to 70 ”;
  • Broth Decanter Manufacturing, Assembly and Installation – 01 unit cap. 600 m³;
  • Assembly and Installation of Particle Separator Filter System;
  • Assembly and Installation of Vacuum Filtration System.
  • Alcohol Storage System:
  • 02 Tanks cap. 20,000 m³ each;
  • Interconnection of the Fire and Alcohol System.